Friday, October 22, 2010

The digging - it starts!!! For future reference - so as to start the pavers level with the driveway:

4" gravel
+ 2" sand
+ 2 5/8" pavers
- 3/8" final compacting
_____________
dig down 8 1/4"

I'm thinking, though, that they should mostly stick up at least 1" above the grade, since I will be heaping dirt and mulch on top of the existing grade to create garden beds. SO, while I will dig to the depth above for the first row, for the rest:

4" gravel
+ 2" sand
+ 2 5/8" pavers
- 3/8" final compacting
- 1" above grade
_______________________
dig down 7 1/4"

No comments:

Post a Comment